Description
TM 9-1430-377-25P/2 Pershing Power Distribution Control and Cable Assembly Sets Illustrated Parts Manual
Item Overview
This July 1969 U.S. Army technical manual covers power distribution control and cable assembly sets for the Pershing Guided Missile System. The /2 volume is an illustrated repair-parts and special-tools supplement designed to help maintenance and supply personnel identify assemblies and service parts. Its numbered illustrations supported parts research, maintenance planning, and the ordering of replacement components. This publication is an illustrated parts reference rather than a complete operating manual.
Identification and Features
This manual documents an important part of the electrical network that connected the Pershing missile, launcher, testing equipment, and ground power equipment during field operations.
- Manual Number: TM 9-1430-377-25P/2
- Publication Date: July 1969
- Covered Equipment: Power Distribution Control and Cable Assembly Sets
- Manual Type: Illustrated repair parts and special tools supplement
- Volume: /2 illustration volume
- Weapon System: Pershing Field Artillery Guided Missile System
- Issuing Service: United States Army
How It Worked
The Pershing power station produced both AC and DC electrical power for the missile and its ground-support equipment. After the vehicles reached the firing position, crews connected system cables to supply power to the programmer-test station and erector-launcher. Cables routed through the launcher’s cable mast carried electrical power, test and checkout signals, guidance information, and burst-selection signals to the missile. Ground power remained available until the missile’s internal electrical system was energized. The distribution-control and cable assemblies allowed these separate pieces of equipment to operate as one coordinated system during testing and launch preparation.
Application
The equipment covered by this manual supported the mobile Pershing ground-equipment network. This network included the power station, programmer-test station, erector-launcher, missile cable mast, and related electrical connections. The programmer-test station checked the missile’s flightworthiness, calculated firing information, and entered the required data into the guidance system. Reliable power and signal connections were therefore essential during missile testing, alignment, erection, countdown, and launch preparation.
Historical Background
The U.S. Army began developing Pershing in 1958 as a mobile, solid-fuel replacement for the Redstone missile. The first Pershing test launch took place in 1960, the first dedicated Army unit was activated in 1962, and operational deployment to Europe began in 1964. Pershing used a two-stage solid-fuel missile, inertial guidance, and a nuclear warhead, with a maximum range of about 400 miles. The July 1969 publication date places this manual during the transition from the original Pershing system to the faster Pershing 1a configuration. Field crews used power-distribution and cable equipment during training, missile testing, readiness alerts, and firing-position exercises. Pershing served as an important United States and NATO Cold War deterrent but was never fired in combat. The U.S. Army began replacing Pershing 1a with Pershing II in 1983, and the Pershing missile family was later eliminated under the Intermediate-Range Nuclear Forces Treaty.
Condition
This listing is for the July 1969 paper technical manual described above. No Pershing power-distribution equipment, cable assemblies, missile components, or other manuals are included.
Ideal For
This technical publication is well suited for:
- Pershing missile collectors and historians
- Cold War field-artillery research
- U.S. Army technical manual collections
- Military museums and educational displays
- Researchers studying missile electrical and ground-support systems
- Pershing equipment restoration and identification projects
Approx length 8", Approx width 11", Approx height .25", Approx weight .5lbs.
Pictures are stock images of our inventory. Unless otherwise noted, you will not be receiving the exact item shown in the pictures. The pictures are representative of the item’s general condition. The item you receive might be slightly better, or worse, condition than was shown in the pictures.
Please visit our page about order lead times here: Order Lead Times.